1. |
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not within specification, replace
the A/C pressure transducer.
|
SS-B Solenoid Valve(ON/OFF) Installation
1.
Installation is the reverse of removal.
•
When installing, ...
Components Location
1. Automatic transaxle
2. Valve body assembly
3. Oil pump assembly
...
Components
1. Timing chain
2. Timing chain guide
3. Timing chain arm
4. Timing chain auto tensionr
5. Timing chain cover
6. Drive belt idler
7. Water pump gasket
8. Water pump
...