1. |
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
|
2. |
Inspect the voltage value whether it is sufficient to be regular
value or not.
|
3. |
If the measured voltage value is not within specification, replace
the A/C pressure transducer.
|
Normal maintenance schedule
The following maintenance services must be performed to ensure good emission
control and performance. Keep receipts for all vehicle emission services to protect
your warranty.
Where both mileage ...
Circuit Diagram
...
Inspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Measure the output voltage of the FTPS.
Specification:
...