Rear Shock Absorber Inspection
1.
Check the components for damage or deformation.
2.
Compress and extend the piston and check that there is no abnormal
resistance or unus ...
Installation
1.
Install the intake CVVT (A) and exhaust CVVT (B).
Tightening torque :
63.7 ~ 73.5 N.m (6.5 ~ 7.5 kgf.m, 47.0 ~ 54.2 lb-ft)
...
Power Door Lock Switch Inspection
Driver Door Lock Switch Inspection
1.
Disconnect the negative (-) battery terminal.
2.
Remove the front door trim panel.
(Refer to t ...