1. |
Connect the connectors.
|
2. |
Install the hazard lamp switch.
|
3. |
Connect the negative (-) battery terminal.
|
Front Lower Arm Inspection
1.
Check the bushing for wear and deterioration.
2.
Check the lower arm for deformation.
3.
Check the all bolts ...
Operation
Evaporative System Monitoring
Evaporative And ORVR Emission Control System
This system consists of below items;
-
Fill vent valve
-
...
Component Location
1. PCB fuse & relay box (Head lamp low/ hi, Fuel pump #1, HAC,
Engine control, Front wiper, Rain sensor, Blower, Cooling fan low/ hi, Horn,
Buglar alarm horn, Start relay)
...