1. |
Turn ignition switch OFF.
|
2. |
Disconnect the solenoid valve connector.
|
3. |
Measure resistance between sensor signal terminal and sensor ground
terminal.
|
4. |
Check that the resistance is within the specification.
|
Positive Crankcase Ventilation (PCV) Valve: Installation
1.
Installation is reverse of removal.
PCV Valve installation:
7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ~ 8.7 lb-ft)
...
Power Window Switch Inspection
Power Window Main Switch Inspection
1.
Disconnect the negative (-) battery terminal.
2.
Remove the front door trim panel.
(Refer to ...
Components
1. Brake booster
2. Master cylinder assembly
3. O-ring
...