1. |
Turn the ignition switch ON.
|
2. |
Manually operate the control switch and measure the voltage of
blower motor.
|
3. |
Select the control switch to raise voltage until high speed.
Specification
|
4. |
If the measured voltage is not within specification, substitute
with a known-good power mosfet and check for proper operation.
|
5. |
Replace the power mosfet if it is proved that there is a problem
with it.
|
Rear Bumper Replacement
[5 Door]
•
Put on gloves to protect your hands.
•
...
Positive Crankcase Ventilation (PCV) Valve: Installation
1.
Installation is reverse of removal.
PCV Valve installation:
7.8 ~ 11.8 N.m (0.8 ~ 1.2 kgf.m, 5.8 ~ 8.7 lb-ft)
...
Spark Plug: Installation
1.
Install in the reverse order of removal.
Spark Plug Installation :
14.7 ~ 24.5 N.m (1.5 ~ 2.5 kgf.m, 10.8 ~ 18.0 Ib-ft)
...