(M/T) |
(A/T) |
A/C Pressure Transducer Inspection
1.
Measure the pressure of high pressure line by measuring voltage
output between terminal “1” and “2”.
2.
Inspect the voltage valu ...
Output Speed Sensor Inspection
1.
Check signal waveform of Input & output speed sensor using the
GDS.
Specification:
Refer to "Signal Wave Form" section.
...
Evaporator Temperature Sensor Inspection
1.
Turn the ignition switch OFF.
2.
Disconnect the evaporator temperature sensor connector.
3.
Measure resistan ...