Kia Rio: Inspection| 1. |
Connect the GDS on the Data Link Connector (DLC).
|
| 2. |
Measure the output voltage of the MAPS at idle and IG ON.
|
Circuit Diagram
Removal
Hazard Lamp Switch Installation
1.
Connect the connectors.
2.
Install the hazard lamp switch.
3.
Connect the negative (-) battery terminal.
...
Measurement Method
Projected Dimensions
1.
These are the dimensions measured when the measurement points
are projected into the reference plane, and are the reference dimensions ...
Operation
Evaporative System Monitoring
Evaporative And ORVR Emission Control System
This system consists of below items;
-
Fill vent valve
-
...