• |
Adjust a shift cable.
|
• |
Refill engine with engine oil.
|
• |
Refill a transaxle with fluid.
|
• |
Refill power steering fluid.
|
• |
Refill a radiator and a reservoir tank with engine coolant.
|
• |
Clean battery posts and cable terminals and assemble.
|
• |
Inspect for fuel leakage.
|
- |
After assemble the fuel line, turn on the ignition switch (do
not operate the starter) so that the fuel pump runs for approximately
two seconds and fuel line pressurizes.
|
- |
Repeat this operation two or three times, then check for fuel
leakage at any point in the fuel line.
|
• |
Bleed air from the cooling system.
|
- |
Start engine and let it run until it warms up. (until the radiator
fan operates 3 or 4 times.)
|
- |
Turn Off the engine. Check the level in the radiator, add coolant
if needed. This will allow trapped air to be removed from the cooling
system.
|
- |
Put radiator cap on tightly, then run the engine again and check
for leaks.
|
Positive Crankcase Ventilation (PCV) Valve: Operation Principle
...
Front Impact Sensor (FIS) Removal
•
Removal of the airbag must be performed according to the
precautions/ procedures descr ...
Delivery Pipe Installation
•
Do not use already used injector fixing clip again.
...